Skip to content
Ready to Ship / 2026 Current delivery window: 8–10 weeks

Equipment for fast and far mountain movement.

Systems developed through field use, material research, and continuous refinement.
Production note Made in limited batches.
Current delivery window for Made-to-Order: 8–10 weeks.
Ready-Made ships from stock.

Current Issue

Present-generation equipment available for production.

No flagship product selected — choose one in the theme editor to feature it here.

Ready-Made

In stock and ready to ship. No production wait.

SōH/FAST SōH/FAST
$597.00
Mass 368g / 13oz
Capacity 30 + 10L
Load 25lb
Material Ultra200x
Sold out
PROTOTYPES/B-GRADE PROTOTYPES/B-GRADE
$450.00
Mass 310g / 11oz
Capacity 20 + 8 L
Load 20lb
Material Ultra200x
Sold out
ZERO/WASTE™ Chalk Bucket ZERO/WASTE™ Chalk Bucket
$140.00
Mass 90g
Capacity N/a
Load N/a
Material Ultra200x
Sold out

Made-to-Order

Produced after the order is placed. Also configurable further in the Atelier.

No Made-to-Order products are selected yet. Choose a Made-to-Order collection in Theme settings → Product sources.